BODE — Door Operations Dashboard

2 ALERTS LIVE · 09 MAY 2026 · 14:32
Opencapacity · RABe 523 Series · Set 4B Draft concept
Cycles today
4,812
↑ 6% vs average
Misuse events
7
3 high severity
Avg cycle time
4.2s
Within normal range
Next service
18d
C2-A1 flagged
Train set 4B — overhead door usage heat map
◀ Side A · Platform side Side B · Trackside ▶
Overhead view of 4-carriage train showing door usage heat on both sides Each carriage has 2 doors on Side A (top/platform) and 2 doors on Side B (bottom/trackside), coloured by usage intensity.
Low Moderate High Very high Peak Misuse event

Recent events

Forced entry — door C2-A1 held open 11s past close signal 14:28 · Carriage 2, Side A forward
Extended close time — door C4-A2: 6.8s (threshold 5s) 13:55 · Carriage 4, Side A rear
Forced entry — door C1-A1 held open 8s 12:11 · Carriage 1, Side A forward
Cycle milestone — door C3-A2: 10,000 cycles reached 09:40 · Scheduled service recommended

Maintenance forecast

C2-A1
88%
Service within 7 days recommended
C3-A2
73%
Approaching wear threshold
C4-A2
61%
Slow close time detected today
C1-A1
42%
Normal wear
Others
<20%
All within expected range